HOME

Fast Track

Fast Track Rapid
Manufacturing

When standard timelines won’t work, Fast Track delivers. A dedicated rapid manufacturing cell for high-performance rubber seals — designed for speed, precision, and reliability without sacrificing quality.

1 wk

Production Parts

100%

DFAR Compliant

Daily

Status Updates

Full

Traceability

Not Expedited. Dedicated.

Fast Track Isn’t a Rush Order. It’s a Dedicated Manufacturing Cell.

Most manufacturers offer “expedited” service — they bump your order ahead in the same production queue. That creates bottlenecks and compromises.

Fast Track is different. It’s a dedicated value stream with its own equipment, operators, tooling capabilities, and program management. Your parts don’t compete with standard production. They have their own lane.

The result: production-quality parts in as little as one week, with full traceability and zero quality compromises.

01

Submit Your Requirement

Part number, quantity, timeline, and application. We assess Fast Track feasibility immediately.

02

Dedicated PO Review

A dedicated contract review process ensures accuracy and alignment before production begins.

03

Fast Track Production

Your parts enter the exclusive Fast Track value stream — dedicated equipment, operators, and 3D printed tooling.

04

Deliver with Full Documentation

Parts shipped with detailed inspection reports, DFAR-compliant material certs, and complete traceability.

What We Control

Manufacturing
Capabilities

Multiple manufacturing processes under one roof — selected based on your geometry, volume, material, and performance specifications.

Compound

Mixed in-house. DFAR materials in stock.

Design and Tooling

Designed and built on-site. 3D printed when needed.

Dedicated Manufacturing Cell

Dedicated equipment. Dedicated operators. No queue.

Rapid Manufacturing

Production-quality parts. Full traceability.

What Makes Fast Track Different

Dedicated Resources. Not Shared Capacity.

Every element of Fast Track is purpose-built for speed without quality compromise. This is not equivalent to overtime in the standard shop but rather a parallel manufacturing operation.

Dedicated Contract (PO) Review Process to ensure accuracy and alignment

Include an exclusive value stream, skilled and experienced operators, and a cross-functional team

Dedicated production equipment, technical resources, and 3D printed tooling

Daily status updates and projected milestones with dedicated PM support

When Fast Track
Makes Sense

A premium service designed for situations where standard lead times create real program risk.

AOG / Line Stops

Aircraft on ground or production line stopped. Parts needed immediately to resume operations.

Milestone Deadlines

Program milestones that can’t move. Delivery penalties or qualification deadlines at stake.

Supplier Failure

The primary supplier dropped the ball. You need a qualified alternative — fast.

Rate Ramp / Surge

Production rate increases faster than forecasted. Standard supply can’t keep pace.

Case Study

Fast Track Saves the Program

When a defense contractor’s primary seal supplier failed delivery with 12 weeks until milestone, they needed production parts immediately. Standard industry lead time: 8–14 weeks. Time available: less than 2 weeks.

Rubbercraft’s Fast Track delivered 47 production parts in 6 days, maintaining the program schedule and keeping operations on track.

47

Production Parts

6

Days Total

100%

On-Spec

DFAR Compliant

Materials in stock for immediate production

Full Traceability

Complete material and process documentation

Inspection Reports

Detailed quality docs with every shipment

AS9100 Quality

Same quality system. Zero compromises.